Modular Reaches 250-mine Mark with Vale Installation

This article, featured in Engineering and Mining Journal (E&MJ), discusses Modular’s 250th-mine milestone. Vale’s Pico Mine, in Brazil, was presented with a plaque commemorating the 20-year business relationship with Modular; over the years, Vale has implemented Modular’s technologies at 14 of its mine sites worldwide, installing the systems on their fleet of trucks, shovels, drills, loaders, dozers, and auxiliary equipment. Now, they’re also relying on Modular’s MasterLink Enterprise solution to provide their wireless network infrastructure.